Marr College
Contents |
[edit] Protecting historic buildings
Historic buildings form a substantial part of our architectural landscape. Often, listed status means that these ageing buildings continue to be celebrated for their significance to the local area, and appreciated for their architectural beauty – a testament to building techniques and craftsmanship of times gone by. In order to protect these unique spaces for future generations, a sensitive approach must be taken to restoration, ensuring the original architectural characteristics are preserved.
Founded in 1935, Marr College in Troon, Scotland, is one such example. Category B-listed, the secondary school is of special historic interest, both due to its architectural style and because it was created with the financial backing of local coal merchant, Charles Kerr Marr. Serving the local community for more than 80 years, an overhaul and expansion was recently required to allow for increased accommodation.
As the building has listed status, any expansion would need to be carefully considered, allowing the building to become more suited to modern demands without losing its heritage. As part of this, meeting the necessary safety requirements of today’s Building Regulations was crucial – something which could be achieved by specifying materials appropriately.
[edit] Adequate fire protection
With increased numbers of students now attending Marr College, achieving improved building circulation was a critical part of the development. This involved a change of use of two existing courtyard spaces to create large multi-use atria, made possible with the installation of an ethylene tetrafluoroethylene (ETFE) roof. Alongside creating larger and more practical spaces, ensuring effective fire protection without detracting from the courtyards’ architectural features was critical.
That is where Pyroguard came in. Working closely with steel fabrication specialists, Martec Engineering – who provided the steelwork within the courtyards, including Schueco Jansen fire-rated glazed screens – Pyroguard supplied a variety of fire-rated glass solutions to sit within the new screens.
Acting as minimal secondary glazing, these screens allow the building’s original 1930s Crittall-style metal windows to remain in the spotlight. The screens are designed to have the smallest visual impact possible while providing the required protection to the rooms beyond, adhering to EI30 and EI60 ratings as required.
[edit] The solution
To ensure a product that could meet all the fire and loading requirements was specified, Pyroguard provided expert technical guidance to cater for the project’s constraints of working within a listed building, and helping with the specialist design of additional fire-rated glazing to be incorporated in existing timber windows and doors.
Due to the ambitious nature of the project, more than 300m2 of Pyroguard toughened glass (including Pyroguard Integrity Plus T EW30/6, Pyroguard Rapide Plus EI30/EI60 and Pyroguard Protect T-EI60) was chosen for its quality and safety features. Protecting against flames, smoke and radiant heat, the selected glazing range has the advantage of providing Marr College with additional radiant heat control and greater fire protection. In tests, this glass demonstrates the ability to maintain the amount of radiant heat to below 15 kW/m2 on the unexposed face, protecting critical evaluation routes for occupants.
Keith Milne, design manager at Martec Engineering, said: “The information and guidance from the technical team at Pyroguard was invaluable on this project, particularly in regards to creating a custom detail for the fire protection within the existing timber windows and doors. We worked hand-in-hand with Pyroguard through the whole project, ensuring the correct specification and design of products would provide the safety and security that this building required.”
“A key requirement of our steel secondary glazing fire screens, was for them to fade into the background and not detract from the character of the building. This was achieved with our manufacture of high-quality steel frames with minimal sight lines and Pyroguard’s fire-rated safety glass.’
The result of this collaboration was the creation of a space which is light, airy and elegant, providing all safety protections in the event of a fire without impacting on the architectural language of the original building.
[edit] About this article
This article was written by Andy Lake, UK Projects Director, Pyroguard. It was previously published in CIAT’s AT magazine, issue 128 Winter 2018/2019 and can be accessed here.
[edit] Related articles on Designing Buildings Wiki
- Approved document B.
- Automatic fire sprinkler systems: A good practice guide.
- Fire and rescue service.
- Fire damper.
- Fire detection and alarm system.
- Fire door.
- Fire protection engineering.
- Fire resistance.
- Fire safety design.
- Fire spread.
- Fire stopping.
- Firefighting route.
- Installing fire doors and doorsets (GG 86).
- Joint fire code.
- Protected escape route.
- Protected lobby.
- Managing fire risk in commercial buildings: A guide for facilities managers.
- Managing risks in existing buildings: An overview of UK risk-based legislation for commercial and industrial premises (FB 86).
- Means of escape.
- Sprinkler.
- The role of codes, standards and approvals in delivering fire safety.
- Understanding the factors affecting flashover of a fire in modern buildings.
- Unprotected escape route.
--CIAT
Featured articles and news
About the 5 Percent Club and its members
The 5% Club; a dynamic movement of employers committed to building and developing the workforce.
New Homes in New Ways at the Building Centre
Accelerating the supply of new homes with MMC.
Quality Planning for Micro and Small to Medium Sized Enterprises
A CIOB Academy Technical Information sheet.
A briefing on fall protection systems for designers
A legal requirement and an ethical must.
CIOB Ireland launches manifesto for 2024 General Election
A vision for a sustainable, high-quality built environment that benefits all members of society.
Local leaders gain new powers to support local high streets
High Street Rental Auctions to be introduced from December.
Infrastructure sector posts second gain for October
With a boost for housebuilder and commercial developer contract awards.
Sustainable construction design teams survey
Shaping the Future of Sustainable Design: Your Voice Matters.
COP29; impacts of construction and updates
Amid criticism, open letters and calls for reform.
The properties of conservation rooflights
Things to consider when choosing the right product.
Adapting to meet changing needs.
London Build: A festival of construction
Co-located with the London Build Fire & Security Expo.
Tasked with locating groups of 10,000 homes with opportunity.
Delivering radical reform in the UK energy market
What are the benefits, barriers and underlying principles.
Information Management Initiative IMI
Building sector-transforming capabilities in emerging technologies.
Recent study of UK households reveals chilling home truths
Poor insulation, EPC knowledge and lack of understanding as to what retrofit might offer.